Photo Gallery of Construction Projects in Kamloops & Fort St John

On this page we present photos and descriptions of some of the projects we have completed in locations throughout Western Canada. Take a moment to check them out and then contact us to discuss your own planned project.


Tete-Jaune CNR Clearance Improvement

Reconstruction of approximately 1km of Highway 5 North of Valemount to increase the clearance capacity under the two CNR overheads located near to the Tete-Jaune Junction.

Kamloops Airport GA Apron Rehabilitation

The project work scope consists of the rehabilitation of General Aviation (GA) Apron; New Helipads; New Access Road; and Various Electrical Works. The executed work includes: Topsoil Stripping; Pavement Removal; Common Excavation; Supply & Place Granular Subbase; Supply & Place Granular Base; Supply & Place PCC; Supply & Place HMA; Line Markings; and Electrical Works.

Hillside Stormwater Improvements

The construction of approximately 1,000 m of underground storm sewer with sizes ranging from 300 mm to 1050 mm diameter, associated inlet and outlet headwalls, manholes, and riprap armor, and approximately 2,000 m3 of earthworks related to the construction of a stormwater management facility.

MoTI Highway 1 Malahat Safety Improvements Shawnigan Lake Road to Malahat Summit Weather Station

Highway widening and placement of 2.3 km median barrier and intersection improvements including 1 km of southbound passing lane extension and U-Turn facilities. Culvert extensions, retaining walls, highway grading and drainage construction, overlay and level course paving. Traffic and Quality Control.

MoTI Asphalt Surfacing, Kamloops Area Paving on TCH 1, Westsyde Road, Hwy 5A and Lac Le Jeune Road (90.58 Lane KM) – with addition of the Red Bridge

Asphalt Resurfacing of 5 separate areas in Kamloops consisting of Quality Management, Traffic Management, Survey Layout and Site Survey Plan, Site Modifications, Aggregate Production, Asphalt Mix Design, Cold Milling, Remove and Replace CRB, Pulverizing, Supply and Apply Tack Coat, Bottom Lifts, Level Course, Top Lift with Polymer AC, Top Lift and Shouldering. Red Bridge Work consisted of Milling, Membrane and Paving.

MoTI Kicking Horse Canyon Project Phase 3 West – 4 Kilometre Grading, Paving and Finishing

Grading and roadwork consisting of approximately 79,000 m3 of Type D excavation. The construction of a reinforced slope retention system and the installation of drilled horizontal slope drains. The construction of approximately 131m of cast-in-place reinforced concrete barrier and slab. The work also consists of 7,723 tonne asphalt paving, drainage works, barrier removal and placement, wildlife exclusion fencing, quality and traffic management.

Village of Canal Flats Eagle’s Nest Water Connection, Reservoir and Booster Station

Supply and installation of water supply system, construction of reservoir and booster station.

MoTI Trans Canada Highway No. 1 – Pritchard to Hoffman’s Bluff Phase 1 & MoTI Trans Canada Highway No. 1 Monte Creek to Pritchard Four Laning – Phase 2

Combined 70,737 tonnes of asphalt paving.

Anderson Point Public Access Facilities

Construction of breakwater, boat launch and approaches.

Created by

Legal notice