• Home
    • Projects
  • Employment
    • Application Form
    • Human Resources
  • Safety
  • Services & Sales
  • Technical Services
    • Environment
    • Quality Management
  • Contact Us

PROJECTS

tobiano projects page

Excavator and trench at Tobiano Golf Resort.

Sewer force main 2.5 km of HDPE fused piping at Tobiano Golf Resort near Kamloops, where Dawson acted as prime contractor for the development.

Agate Bay

Highway 5 at Agate Bay

Realignment of existing highway, creation of industrial area and new intersection for access to Agate Bay Road.

 

Joint Use Vehicle Inspection Station 300

Joint Use Vehicle Inspection Station

Dawson Construction in the early stages of building the Joint Use Vehicle Inspection Station (JUVIS) near the British Columbia/ Alberta border. A joint venture between the Alberta and BC governments this is a combined weigh scale and inspection facility.

 

Fish Stream Diversion 300

Fish Stream Diversion

Salmon enhancement program near Salmon Arm BC, DCL undertook the environmental task of redirecting a sensitive fish stream to protect it from the construction activities that were near.

 

Hugh Allen project

Hugh Allen Extension

Two trucks paving at the Hugh Allen Drive Extension in Kamloops, BC.

Portable Asphalt Plant at Agate Bay 300

Portable Asphalt Plant at Agate Bay

One of DCL paving plants in production on Highway 5 at Agate Bay British Columbia.

 

7300

Woods Overhead

The Woods Overhead Project located near 3 Valley Gap British Columbia consisted of the demolition of an existing bridge, which spanned the Salmon River and the Canadian Pacific Railway mainline, reconstruction of a new bridge and realignment of the existing highway.

 

Hauling at Golden 300

Hauling at Golden

Grade construction in Golden BC.

 

9300

City of Kamloops Track and Field facilty

Special projects offering unique challenges have included the construction of an Olympic Games standard Running Track, Playing fields and Throws Area at the Thompson Rivers University and the installation of 40 kilometeres of geothermal tubing to provide ground source heating and cooling for the new indoor track facility.

 

Print This Page
Email This Page
Copyright © 2006 - 2009, Dawson Construction. All Rights Reserved
Powered by SiteCMTM— web content management made easy by ideaLEVER Solutions.